Projects


SOFIA METRO EXTENSION Konektor Dragan Zankov


 


Year: 2007 - 2008

Role of Georh Engineering in the project:

Technical Studies and investigation of the seismic influences over MS 9

Tunneling through the NATM (New Austrian Tunneling Method) double metro tunnel, 81 ì2 (mining cross section) with partial usage of an exiting underground facility.